Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/37/d646193543/htdocs/app646193777/wp-content/plugins/revslider/includes/operations.class.php on line 2362

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/37/d646193543/htdocs/app646193777/wp-content/plugins/revslider/includes/operations.class.php on line 2366

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /homepages/37/d646193543/htdocs/app646193777/wp-content/plugins/revslider/includes/output.class.php on line 3169
Home - CAD.42

Don’t miss our news !

About us

CAD.42 provides a solution that enables industries to transform their operations while achieving and sustaining operational excellence. Its award-winning hardware, software and services solutions tightly synchronize global operations by delivering real-time visibility and control across the enterprise.

 

CAD.42 solution functions like a software-based platform for Production Operations Management. CAD.42 Production Execution System (PES)  offers more than just a way to manage people, processes and resources of production operations at a plant.  CAD.42 PES product offering is a global solution to manage production, safety, quality, maintenance and labour tracking processes across all locations. Major global companies in Construction, Energy or Transport and more leverage CAD.42 solution to achieve global production excellence through Lean construction, Six Sigma and other continuous process improvement initiatives.
Learn More

Millions of data processed per day.
More than 6000 near miss alerted to workers.
%
time wasted detected on none value added activities.

Realtime and connected solutions

We deploy the infrastructure on site and you have the control via our interface

Safety

Avoid the risk of accidents on site

Lean 4.0

Improve your production performance

Logistic

Control your equipment fleet

Industries

Construction

Maintenance

Energy

Manufacturing

Mining

Logistic

Testimonials

“The implementation of this solution in a worksite alongside our partner , CAD.42 , places the Lean approach at the center of the real time BIM model. This dynamic  digital twin foretells the worksite of tomorrow.”

Pierre George,
Innovation Director and Information Systems Director

“Thanks to the CAD.42 ecosystem, it becomes possible to ensure real time monitoring of worksites and give life to their digital model/avatar.
The data which have been collected in such a way are also employed at the service of productivity.
The already deployed solution in conjunction with a LEAN approach allow to streamline and to optimize operational processes.”

Julien Gardette,
Innovation Director

Last News

Partners

They trust us!

“IF YOU CAN’T MEASURE IT, YOU CAN’T IMPROVE IT.”

Lord Kelvin