Increase productivity during construction by detecting waste and non-value added time. Control relationships suppliers/subcontractors by measuring incoming/outgoing flows.
Reduce risks on the construction site. Plan better future stages of the construction site or future construction sites which present similar construction methods.
Creation and monitoring of indicators performance keys
Unifield.io allows you to define indicators production or safety tracking keys using cranes equipped with the system.
Dashboards are available in real time on Unifield and reports in pdf form are sent to the construction site every day.
Automated chrono-analysis
CAD.42's automatic chrono-analysis makes it possible to identify problems as early as possible during construction.
For the methods, the site, the price studies… the result makes it possible to make the site better and to capitalize in the medium/long term by changing unit times according to objective criteria.